Construction Photos 50:
Taken 24, 25, 26, 28, 30 & 31 October and 3 & 4 November, 2003

    Notes:  Exterior work on color and the rock walls for the sanctuary and grey water system. Interior the floors upstairs got finished and cables started going on the railing and some trim around the doors.
 
October 24: Cololr on the exteriors going on.
October 25: Erin liking the rocks.
October 25: Moving rocks into place for the shower. 
October 25: Pushing some rocks into place.
October 26: Sanctuary rock walls.
October 28: More exterior colors. 
October 30: Floors upstairs getting sanded.
October 30: Sanding in Elton's room.
October 30: Propane tank and the green wall. 
October 31: SNOW! Very cool with the purple color.
October 31: Scaffolding around the greatroom finally coming off.
October 31: Finish on the floors really looks good. 
October 31: Closeup of the clear coat on the juniper floors.
November 3: Scaffolding OFF! Wow, what a wall. 
November 3: Solar pipes... Up is the right (60F) down in left (110F). 
November 4: Grey water tank in place. 
November 4: Pat lining up the cables. 
November 4: Coat one of three on the floors. Coat 2 went on about an hour after this photo was taken. More soon. 
November 4: Trim around the doors starting!
November 4: Moving the woodsove into position.