October 24: Cololr on the exteriors going on.
 |
October 25: Erin liking the rocks.
 |
October 25: Moving rocks into place for the shower.
 |
October 25: Pushing some rocks into place.
 |
October 26: Sanctuary rock walls.
 |
October 28: More exterior colors.
 |
October 30: Floors upstairs getting sanded.
 |
October 30: Sanding in Elton's room.
 |
October 30: Propane tank and the green wall.
 |
October 31: SNOW! Very cool with the purple color.
 |
October 31: Scaffolding around the greatroom finally coming off.
 |
October 31: Finish on the floors really looks good.
 |
October 31: Closeup of the clear coat on the juniper floors.
 |
November 3: Scaffolding OFF! Wow, what a wall.
 |
November 3: Solar pipes... Up is the right (60F) down in left (110F).
 |
November 4: Grey water tank in place.
 |
November 4: Pat lining up the cables.
 |
November 4: Coat one of three on the floors. Coat 2 went on about an
hour after this photo was taken. More soon.
 |
November 4: Trim around the doors starting!
 |
November 4: Moving the woodsove into position.
 |