Oct 18: Dog shower tiles getting set.
 |
Oct 18: Stain going on the greatroom floor.
 |
Oct 18: Mary supervising the floor staining.
 |
Oct 19: Very white grout going on the glass tiles.
 |
Oct 19: The finished product.
 |
Oct 19: Detail of the glass tiles and deccos.
 |
Oct 19: The very blue floor of the dog shower.
 |
Oct 22: Trimming around the electrical outlet on the upstairs floor.
 |
Oct 22: Pat getting down and dirty with the cabinets.
 |
Oct 22: Jesse and Shawn sanding away, as the wood floor continues.
 |
Oct 22: Painters putting clear coat on the big beams.
 |
Oct 23: Pat working away on the kitchen cabinets. q
 |
Oct 23: Alex working on the bathroom cabinets.
 |
Oct 23: The pebble walls with the coat of sealant on.
 |
Oct 23 George prepping to do the trim piece. We manged to bend it along
the radius.
 |
Oct 23: Two very happy floor installers with a finished floor.
 |