October 7: Rock wall as a pile of rocks in the courtyard.
 |
October 7: The first rock set for the wall.
 |
October 7: The first line of stones in for the rock wall.
 |
October 7: Doors in waiting... waiting to be installed.
 |
October 7: Doors being installed in the hallway.
 |
October 7: Mechanical room taking shape...
 |
October 8: Pat preparing to sandblast the Trombe wall.
 |
October 8: The rock wall moving up, up and up.
 |
October 8: Russel making the cuts in the support rounds.
 |
October 9: Ceiling sheetrock repairs and patching.
 |
October 9: Steps at the sanctuary entrance.
 |
October 9: Mechanical room mostly plumbed.
 |
October 9: Russel with the trellis.
 |
October 10: Rock wall even farther along.
 |
October 9: Kevin setting stones on the wall.
 |
October 10: Septic leach field with view!
 |
|
|