October 4: Diggin' in the dirt for the septic system.
 |
October 4: The septic tank (aka the Yellow Subterranean) ready to go
in.
 |
October 4: Septic tank in place.
 |
October 4: Inkberry going in the master bedroom.
 |
October 4: Paining work in the great room.
 |
October 4: Painting in the hall.
 |
October 4: View down the hall with all the color.
 |
October 4: Greatroom almost finished.
 |
October 4: Tile work: careully grinding the edges.
 |
October 4: The finished product, south wall.
 |
October 4: Finished product II: the east wall.
 |
October 5: Now with grout on it! Really finished.
 |
October 5: More views with the grout on.
 |
October 5: Detail of the corner work. All the rounding and polishing
was done by hand.
 |
October 5: Work starting in the master bath.
 |
October 5: Almost set one wall.
 |
|
|