Construction Photos 45:
Taken 28, 29 & 30 September; 1 & 3 October 2003

    Notes: Tiling work continued along well and more roofing went on. Juniper posts got set, and the hydronic floor top-out started.
 
September 28: Travertine continuing down the wall on the wainscoting
September 28: Stone around the shower valve and the slate stripe.
September 28: Slate stripe on the other side.
September 28: The thinker contemplates the pedestal sink.
September 29: Greatroom roof mostly finished. Just need to trim off the excess.
September 30: Work continuing on the roof. 
October 1: The Juniper posts that will make our hand-rail along the loft.
October 1: Another view of the loft. 
October 3: View from the south patio of Mt. Rose.
October 3: Working on the last of the siding. 
October 3: Jesse doing his death-defying high-scaffold act.
October 3: View over the greatroom roof at Slide Mountain.
October 3: Kelly carefully sweating the boiler manifold.
October 3: The boiler and hot water heater.