September 28: Travertine continuing down the wall on the wainscoting
 |
September 28: Stone around the shower valve and the slate stripe.
 |
September 28: Slate stripe on the other side.
 |
September 28: The thinker contemplates the pedestal sink.
 |
September 29: Greatroom roof mostly finished. Just need to trim off
the excess.
 |
September 30: Work continuing on the roof.
 |
October 1: The Juniper posts that will make our hand-rail along the
loft.
 |
October 1: Another view of the loft.
 |
October 3: View from the south patio of Mt. Rose.
 |
October 3: Working on the last of the siding.
 |
October 3: Jesse doing his death-defying high-scaffold act.
 |
October 3: View over the greatroom roof at Slide Mountain.
 |
October 3: Kelly carefully sweating the boiler manifold.
 |
October 3: The boiler and hot water heater.
 |
|
|
|
|