Construction Photos 44:
Taken 22, 25, 26 & 27 September 2003

    Notes: Finish work contiuing at a great pace. Siding being wrapped up, trellis posts on, roofing being finished and PAINT!
 
September 22: Justin and Jesse working on the siding batts.
September 22: Jesse strikes a pose.
September 22: John wiring in the temperature sensor at the roof, as Justin looks on. This is a bad idea late in the afternoon. The pannels were 210 F. Excellent photography by Jesse.
September 25: Trellis on the south side. Mary's photo.
September 25: South side trellis from the other side.
September 25: Late afternoon sun on the greatroom.
September 26: Russel and Jose working on the west trellis.
September 26: Pat, Alex and Sean roofing. 
September 26: Alex with Slide and Rose in the background.
September 26: Sean gently moving roofing around. 
September 26: Alex and Pat setting the bottom edge.
September 26: Sean setting the roof screws. Ok, Tinker, is that enough photos of Sean?
September 27: The garage getting it's final coat.
September 27: John the painter uncovering the beams. 
September 27: Allyson's room after the first coat of "Ambitious Amber".
September 27: John putting the "Cilantro" on the dining room.
September 27: Elton's room gets its coat of "Cilantro".