Notes: Stucco scratch coat goes on and the Solar thermal panels get installed and fitted.Construction Photos 42:
Taken 17 September 2003
Stucco work going on.
![]() |
More closeup of the stucco.
![]() |
Alex fitting the brackets to the solar pannels.
![]() |
Making sure the brackets fit right and are straight.
![]() |
The first pannel being moved up to the roof.
![]() |
Getting closer.
![]() |
Getting closer.
![]() |
and closer...
![]() |
| Pat and Alex getting the brackets in on the first panel.
|
Alex fitting the first panel.
![]() |
Kelly from Jackrabbit plumbing getting the pannels ready for solder.
![]() |
Pat lag bolting in the second panel.
![]() |
Kelly getting ready to solder.
![]() |
Kelly sweating the fittings.
![]() |
The (almost) finished product. Looking good.
![]() |