Construction Photos 41:
Taken 10, 13, 14, 15, & 16 September 2003

    Notes: The exterior insulation was finished, the roofing is going on and the weekend of the 13th and 14th we started the prep work for the tile. Sheetrock is in and siding is going on. Plus I put in the vent for the composting toilet.
 
September 10: Getting ready for stucco.
September 10: Work continuing on the roof.
September 10: More roof work.
September 10: Justin and Alex on the greatroom roof. 
September 13: Prep work for laying mud. 
September 13: Wire up for mud.
September 13: Shower pan in the dog shower.
September 14: Mud on the upstairs wall.
September 14: Mud in the upstairs bath.
September 14: Mud in the master bath.
September 15: Roofing and stucco prep work.
September 15: Jesse making sure the door is plumb. 
September 16: Jose cutting siding.
September 16: Russel setting the support for the trellis.
September 16: Siding going up on the second level.
September 16: The vent for the composting toilet.