September 10: Getting ready for stucco.
 |
September 10: Work continuing on the roof.
 |
September 10: More roof work.
 |
September 10: Justin and Alex on the greatroom roof.  |
September 13: Prep work for laying mud.
 |
September 13: Wire up for mud.
 |
September 13: Shower pan in the dog shower.
 |
September 14: Mud on the upstairs wall.
 |
September 14: Mud in the upstairs bath.
 |
September 14: Mud in the master bath.
 |
September 15: Roofing and stucco prep work.
 |
September 15: Jesse making sure the door is plumb.
 |
September 16: Jose cutting siding.
 |
September 16: Russel setting the support for the trellis.
 |
September 16: Siding going up on the second level.
 |
September 16: The vent for the composting toilet.
 |