September 5: First part of the roof to go up was the shed roof.
 |
September 5: Insulation working around the exterior.
 |
September 5: Another view of the south side.
 |
September 5: Jose working on the knee braces.
 |
September 5: Work on the stucco.
 |
September 5: More work on the roof.
 |
September 5: Interior finishes prior to the sheetrock.
 |
September 5: Insulation being blown in behind the fabric.
 |
September 5: A look at the insulation in the master bedroom.
 |
September 6: Almost finished with insulating the greatroom.
 |
September 6: Mary trying out the upstairs tub. She likes it!
 |
September 8: Sheetrockers starting in the upstairs bedroom.
 |
September 8: More sheetrock work.
 |
September 8: Russel checking the walls.
 |
September 8: A look at the greatroom with all the knee braces in.
 |
September 8: More roofing finished, and the wrapping almost done.
 |