Construction Photos 40:
Taken September 5, 6 & 8, 2003

    Notes: In this week the roof is starting to go on, the insulation went in and the sheetrockers started. The outside is being wrapped and pretty soon the stucco will start.
 
September 5: First part of the roof to go up was the shed roof.
September 5: Insulation working around the exterior.
September 5: Another view of the south side. 
September 5: Jose working on the knee braces.
September 5: Work on the stucco.
September 5: More work on the roof.
September 5: Interior finishes prior to the sheetrock.
September 5: Insulation being blown in behind the fabric.
September 5: A look at the insulation in the master bedroom.
September 6: Almost finished with insulating the greatroom.
September 6: Mary trying out the upstairs tub. She likes it!
September 8: Sheetrockers starting in the upstairs bedroom.
September 8: More sheetrock work. 
September 8: Russel checking the walls. 
September 8: A look at the greatroom with all the knee braces in.
September 8: More roofing finished, and the wrapping almost done.