August 28: All the equipment layed out...
 |
August 28: Three wires, one each for power, common, and signal out.
 |
August 28: The finished joint.
 |
August 28: The shrink-wrapped joint in the bedroom.
 |
August 28: Wiring running by the trombe wall.
 |
August 28: Hole in the trombe wall for the sensor. Exactly halfway
through.
 |
August 28: Sensor in.
 |
August 28: Two sensors, one in each wall.
 |
August 29: More ice dam work on the roof. Looks to me like Sean, Justin,
Jesse and Alex.
 |
August 29: Alex and Jesse on the south side. Note the solar stub out
to the right of Jesse. And someone please get Alex some suspenders.
 |
August 29: Wheels and channels like what we are getting for the barn
door.
 |
August 29: One view of the staining on the Trombe wall.
 |
|
August 29: Another view of the Trombe wall staining. Awesome job.
 |