Construction Photos 36:
Taken 24 & 27 July, 2 August 2003

    Notes: This Thursday July 24 (the day after the lightning strike) the last of the big beams go up and we move some rocks inside the space between the Trombe walls using the crane. July 27 and August 2 more framing around the greatroom. On July 27 we met with Joe to work out the details of the lighting, which is going to be COOL!
 
24 July: Jose setting the last of the knife blades
24 July: View from the northwest of the rest of the timber framing.
24 July: View of the trusses over the mid section.
24 July: View from the southeast. 
24 July: Moving a big rock for the indoor fountain.
24 July: Up, up and away.
24 July: The rocks in place inside (doesn't Erin look excited).
24 July: View of the big beam going in from Tompson lane. 
27 July: More framing work on the greatroom.
27 July: View of the timbers before they covered up.
2 August: Framing moving long now including the windows
2 August: Closeup of the windows framing.
2 August: View from the inside of Slide Mountain.
2 August: The inside taking its shape. For scale the window on the left is 6' tall.