24 July: Jose setting the last of the knife blades
 |
24 July: View from the northwest of the rest of the timber framing.
 |
24 July: View of the trusses over the mid section.
 |
24 July: View from the southeast.
 |
24 July: Moving a big rock for the indoor fountain.
 |
24 July: Up, up and away.
 |
24 July: The rocks in place inside (doesn't Erin look excited).
 |
24 July: View of the big beam going in from Tompson lane.
 |
27 July: More framing work on the greatroom.
 |
27 July: View of the timbers before they covered up.
 |
2 August: Framing moving long now including the windows
 |
2 August: Closeup of the windows framing.
 |
2 August: View from the inside of Slide Mountain.
 |
2 August: The inside taking its shape. For scale the window on the
left is 6' tall.
 |