Construction Photos 35:
Taken 17 & 18 July 2003

    Notes: On the 17th, we just visited, but on the 18th the crane showed up and lifted the big timbers into the sky and onto the posts. The process was amazing; the result is equally so.
 
17 July : The forest of posts is up and the beams are out and ready.
17 July: The anticipation of something big is there.
18 July: Pat putting the finishing touches on the joints.
18 July: Pat making those last few cuts. 
18 July: Up, up and away.
18 July: First big timber drops into place.
18 July: Pat using the pipe clamp to get it just right.
18 July: Russel hanging out.
18 July: One of the biggest pieces going in...
18 July: Getting closer....
18 July: The result, viewed from beam level. Pretty amazing. 
18 July: Allyson visits the site to see all the big timbers moving.
18 July: Russel guiding one of the last ones to go in today.
18 July: Almost there...
18 July: Russel, Jose, and Pat fine tuning the fit.
18 July: Russel and Robb supervising (they need shovels to lean on!).