July 8: Anchors on the top of the Trombe wall for posts.
 |
July 8: Around the corner of the hall looking at the loft.
 |
July 8: Better view of the curve of the front of the loft.
 |
July 8: View from inside the kitchen at Slide Mountain.
 |
July 8: Mary in the kitchen.
 |
July 8: Scott, Robb and Mary going over details in the shade.
 |
July 10: LVL posts for the greatroom are up! The board on top of the
posts shows the slope of the eventual roof line.
 |
July 10: View from the west side of the LVL posts.
 |
July 11: Rake wall making the southeast corner of the greatroom
 |
July 11: Trusses sitting up on the top of the second story.
 |
July 11: View from the loft.
 |
July11: View from the hallway looking at the framed wall. Knife blades
on top of the trombe wall are for the posts that will hold up the second
story roof.
 |
July 11: View up from the livingroom
 |
July 13: Solar design in action. High noon, and look at that roof shading.
 |