Construction Photos 33:
Taken 8, 10, 11 & 13 July 2003

    Notes: July 8 Mary and I met with Robb and Scott to go over windows and doors. July 9 Robb and crew put up the big engineered posts for the southeast corner of the greatroom. Keeps getting bigger.
 
July 8: Anchors on the top of the Trombe wall for posts.
July 8: Around the corner of the hall looking at the loft.
July 8: Better view of the curve of the front of the loft.
July 8: View from inside the kitchen at Slide Mountain.
July 8: Mary in the kitchen.
July 8: Scott, Robb and Mary going over details in the shade.
July 10: LVL posts for the greatroom are up! The board on top of the posts shows the slope of the eventual roof line.
July 10: View from the west side of the LVL posts. 
July 11: Rake wall making the southeast corner of the greatroom
July 11: Trusses sitting up on the top of the second story.
July 11: View from the loft. 
July11: View from the hallway looking at the framed wall. Knife blades on top of the trombe wall are for the posts that will hold up the second story roof. 
July 11: View up from the livingroom
July 13: Solar design in action. High noon, and look at that roof shading.