Construction Photos #32:
Taken 3 & 5 July 2003

    Notes: Wow! We were gone for a week and so much happened. Lots of framing. The second story is up and looking great. The first of the big timbers are up. Wow!
 
July 3: Pat works on the timber framing.
July 3: Second story with hall and bathroom windows showing.
July 3: View from above the timber frame over the kitchen.
July 3: Looking down from the (not quite finished) loft.
July 3: One huge glue-lam holding the garage roof up.
July 3: The first round post in, holding up the second floor. 
July 3: Looking up at the framing from the kitchen area.
July 3: Recycled 4x10's going into the pockets on the Trombe wall.
July 3: More of the timbers in the hallway.
July 3: Overview from the northwest side. 
July 5: More framing, more walls, more of everything....
July 5: Looking back from Thompson Lane.