July 3: Pat works on the timber framing.
 |
July 3: Second story with hall and bathroom windows showing.
 |
July 3: View from above the timber frame over the kitchen.
 |
July 3: Looking down from the (not quite finished) loft.
 |
July 3: One huge glue-lam holding the garage roof up.
 |
July 3: The first round post in, holding up the second floor.
 |
July 3: Looking up at the framing from the kitchen area.
 |
July 3: Recycled 4x10's going into the pockets on the Trombe wall.
 |
July 3: More of the timbers in the hallway.
 |
July 3: Overview from the northwest side.  |
July 5: More framing, more walls, more of everything....
 |
July 5: Looking back from Thompson Lane.
 |
|
|