Construction Photos 29:
Taken 11, 13, 17 & 18 June 2003

    Notes: Mary and I went out in the evening (11th) to see the framing progress. On the 13th my family came to visit, and on the 17th and 18th we just made visits to see what had happened.
 
June 11: Overview from Thompson lane driving in.
June 11: In the garage, looking south.
June 11: From the master bedroom looking north.
June 11: Looking at the framing in the laundry room.
June 13: (l to r) Molly,Dick, Daisy, Kim, Peter and Erin visit the site.
June 13: East wall of the bathroom and the end of the hall.
June 13: Looking at the kennels, east side.
June 17: Wall around the bathtub is framed.
June 17: View from the southeast corner.
June 17: View of Mt. Rose from the bathtub!
June 18: Framing around the bedroom and the interior wall.
June 18: Overview shot from the northwest.