Construction Photos 24:
Taken 21 & 22 May 2003

    Notes: Concrete slabs are being poured. Plus photos of the Trombe wall and others.
 
May 21: Vent piping for the water tank.
May 21: Drain box in the courtyard.
May 21: Garage slab looks pretty good.
May 21: Temperature sensor and wire on the steel for the greatroom. This and a few others will help assess preformance of the passive solar.
May 22: Master bedroom and bathroom slab and control joints, looking west.
Mary 22: Master bed and bath looking south. 
May 22: Master bedroom looking southwest (a bit).
May 22: Finally!  A good look at the Trombe wall.
May 22: Footing at the corner of the pantry.
May 22: Electrical boxes in for the floor outlets in the greatroom.