May 21: Vent piping for the water tank.
 |
May 21: Drain box in the courtyard.
 |
May 21: Garage slab looks pretty good.
 |
May 21: Temperature sensor and wire on the steel for the greatroom.
This and a few others will help assess preformance of the passive solar.
 |
May 22: Master bedroom and bathroom slab and control joints, looking
west.
 |
Mary 22: Master bed and bath looking south.
 |
May 22: Master bedroom looking southwest (a bit).
 |
May 22: Finally! A good look at the Trombe wall.
 |
May 22: Footing at the corner of the pantry.
 |
May 22: Electrical boxes in for the floor outlets in the greatroom.
 |