Construction Photos 23:
Taken 17 & 19 May 2003

    Notes: Water tank photos and the hydronic heat is finished.
 
May 17: Water tank, lawn hydrant and valves for the irrigation system
May 17: Overview shot of the site with the Trombe wall.
May 17: View through the Trombe wall. We won't have this view once the walls are all built.
May 19: Hydronics near the south end of the great room.
May 19: More tubing in the great room.
May 19: Tubing in the hall and Trombe wall.
May 19: Main manifold in the hall closet.
May 19: Tubing in the kitchen.
May 19: Island mapped out in the kitchen.
May 19: Inside of the Trombe wall.