Construction Photos 20:
Taken May 9 & 10, 2003

    Notes: Friday the 9th, more forming was done on the Trombe wall including the bolts for the steps and I installed the supply lines to the tank. On the 10th Mary and I went out to look around and check out the wildlife (see below).
 
May 9: Step bolts in the north Trombe wall
May 9: Step bolts in the South as Dave ties some steel.
May 9: Jesse and Dave tying steel.
May 9: View inside the tank with the shutoff float. The tank is actually level, I just can't photograph that well upside down.
May 10: View from the pump.
May 10: Inlet side of the cistern.
May 10: View from the cistern east to the house.
May 10: Quail on the rock pile. This is as close as he'd let me get.
May 10: I'm trying to draw the line of the south Trombe wall.
May 10: Mica checks out the hallway.
May 10: Wall is ready to be covered up...