May 9: Step bolts in the north Trombe wall
 |
May 9: Step bolts in the South as Dave ties some steel.
 |
May 9: Jesse and Dave tying steel.
 |
May 9: View inside the tank with the shutoff float. The tank is actually
level, I just can't photograph that well upside down.
 |
May 10: View from the pump.
 |
May 10: Inlet side of the cistern.
 |
May 10: View from the cistern east to the house.
 |
May 10: Quail on the rock pile. This is as close as he'd let me get.
 |
May 10: I'm trying to draw the line of the south Trombe wall.
 |
May 10: Mica checks out the hallway.
 |
May 10: Wall is ready to be covered up...
 |
|