Construction Photos 19:
Taken 7 & 8 May 2003

    Notes: May 7, just out for a quick visit. The Trombe wall keeps getting bigger.
            May 8, new water storage tank installed and more Trombe wall being worked.
 
May 7: Trombe wall froms getting bigger.
May 7: View from the rock pile...
May 7: Dave lineing up the snap ties.
May 7: Erin watching the patio being formed. 
May 8. Overview; water tank in the ground and Trombe wall forms.
May 8: Inside the stair space.
May 8: 1700 gallons of water storage in the ground.
May 8: The wall is up! 14.5 feet in the air.
May 8: South wall with the curved top.
May 8: That's quite a tall wall.