Construction Photos 9:
Taken 28 March & 29 March 2003

    Notes: Friday March 28 more work was going on for the last footings and the stem walls. Then we moved on to Cathexes for wine time, which is not exactly construction. March 29 Dick and Daisy came out the site to see it for the first time.
 
March 28: Great room footings for the timber posts outside.
March 28: West wall of the great room.
March 28: View inside the 18" thick stem wall for the trombe wall.
March 28: Stair/Trombe wall supporting stem walls, looking west.
March 28: Stem wall under the south wall with the tie-downs for the posts.
March 28: David entertaining Don.
March 28: James entertaining Dylan.
March 28: Allyson showing Dick and Mary something?
March 29: Mary and Daisy hanging out in the dining room.
March 29: Dick, Daisy, Mary and Erin enjoying the sun.