14 March. Standing in the bedroom looking NW
 |
14 March. In the greatroom, looking north at the kitchen.
 |
14 March. Footing to hold the main timber frame posts.
 |
18 March. Stem walls around garage.
 |
18 March. Garage stem walls.
 |
18 March. Tombe wall footing and laundry room.
 |
18 March. Supports around garage.
 |
18 March. Mary in the great room.
 |
22 March. Standing on the tombe wall footing looking east.
 |
22 March. Middle of the trombe wall footing
 |
22 March. Looking east from the south part of the great room.
 |
22 March. Master bathroom and bedroom.
 |
22 March. Just south of the master bathroom, looking NW.
 |
22 March. Stem wall on west side of the garage.
 |