Construction Photos 8:
Taken 14 March, 18 March, & 22 March 2003

    Notes: 14 March 2003... Two days after the first concrete went in, the forms have been stripped off and prepartions are being made for the stem walls.
    18 March 2003....  Mary and I went out late in the afternoon and looked around and let the dogs run around.
    22 March 2003....  Saturday afternoon, after a bike ride I went out and looked around. There's been a lot of work on the forms for the stem walls.
 
14 March. Standing in the bedroom looking NW
14 March. In the greatroom, looking north at the kitchen. 
14 March. Footing to hold the main timber frame posts. 
18 March. Stem walls around garage.
18 March. Garage stem walls.
18 March. Tombe wall footing and laundry room.
18 March. Supports around garage.
18 March. Mary in the great room. 
22 March. Standing on the tombe wall footing looking east.
22 March. Middle of the trombe wall footing
22 March. Looking east from the south part of the great room.
22 March. Master bathroom and bedroom.
22 March. Just south of the master bathroom, looking NW.
22 March. Stem wall on west side of the garage.