4 March 03. Beautiful sunny day after a light snow.
 |
4 March 03. Robb demonstrates the hammer drill.
 |
5 March 03: Busy day at the site, as Mica checks the steelwork
 |
5 March 03: More site work.
 |
5 March 03: Scott checks the layout.
 |
5 March 03: Robb tying steel.
 |
8 March 03: Steel in for Trombe wall footing
 |
8 March 03: Kim and Peter visiting the site; hanging out in the kitchen.
 |
8 March 03: Mary and Erin checking things out.
 |
8 March 03: Looking east.
 |
8 March 03: Looking north along the eastern edge.
 |
8 March 03: Master bath and bedroom.
 |