Construction Photos 5:
Taken 04, 05 & 08 March 2003

    Notes:  This week the first layer of steel went in. The had to cut through some rock to get straight lines for the steel and make some place for the concrete to go. Concrete should be flowing soon.
 
4 March 03. Beautiful sunny day after a light snow.
4 March 03. Robb demonstrates the hammer drill.
5 March 03: Busy day at the site, as Mica checks the steelwork
5 March 03: More site work.
5 March 03: Scott checks the layout.
5 March 03: Robb tying steel. 
8 March 03: Steel in for Trombe wall footing
8 March 03: Kim and Peter visiting the site; hanging out in the kitchen.
8 March 03: Mary and Erin checking things out.
8 March 03: Looking east. 
8 March 03: Looking north along the eastern edge.
8 March 03: Master bath and bedroom.