Construction Photos 4:
Taken 24 February & 1 March 2003

    Notes: Footeings are mostly dug out. Next we start pouring concrete.
 
View from the southeast corner of the livingroom. The huge cut in the center is the footer for the Trombe wall. 
View from the corner of the bedroom the painted metal stake right of the wooden stake is the floor level in the bedroom.
Corner of the bedroom and bathroom from the south.
Garage area.
View of Trombe wall cut toward the kitchen area.
View of the living room from the west. 
Livingroom covered in plastic. 
1 March 2003, Erin checking the depth of the footings.
1 March 2003. Footing steel going in.
1 March 2003. More shots of the steel.