Last Update December 28,
2003
Construction Photos
Photos
54 More work as we get ready to move in. This is the last
construction
page.
Photos
53 Trim, painting and other trim work.
Photos
52 Granite slab counters go in and more trim work.
Photos
51 Stove going in, stairs installed, trellis work and the ECS grey
water system goes in.
Photos
50 Floor finishes other interior finishes, exterior finishes and
site
work.
Photos
49 Tile finished, concrete stain and wood floor in.
Photos
48 Red room. Rock wall and tile.
Photos
47 Rock wall starts going in, doors and more finish work
Photos
46 More tiling and painting.
Photos
45 Tiling work and more roofing going on. Boiler gets installed.
Photos
44 Exterior finishes, roofing and painting gets going.
Photos
43 Tiling prep is finished and some tile got set.
Photos
42 Stucco scratch coat goes on and Solar panels get installed.
Photos
41 Exterior insulation finished, siding going on and tiling prep
work
is started.
Photos
40 Metal roofing goes on, insulation goes in and the sheetrock
starts.
Photos
39 Wiring sensors, more roof work and the Trombe wall gets stained.
Photos
38 Entry roof, windows going in and roof work.
Photos
37 Finish of the rough framing and more.
Photos
36 More big timbers moving and some rocks go flying through the air.
ZAP!
Big Thunder lives up to its name and takes a lightning hit!
Photos
35 The big 8x20's going in!
Photos
34 More big timber posts going up and prep for the really big
timbers.
Photos
33 Loft curve is in, trusses get delivered and more framing happens.
Photos
32 Big Timbers go up. 10x10 posts are standing, 4x10 beams are in
the
Trombe wall and more.
Photos
31 Special Page! John and Mary visit Big Timberworks in Gallatin
Gateway,
MT.
Photos
30 Framing moves into the kitchen and some big beams go up in the
bedroom
area.
Photos
29 Even more framing, around the bedroom.
Photos
28 More framing.
Photos
27 Walls starting to go up. All interior concrete work and Trombe
wall
finishes.
Photos
26 Finished slabs, wood delivered and some other cool stuff.
Photos
25 Larger Overview Images in the late afternoon light.
Photos
24 Slabs going in! More photos of water system and a view of the
Trombe
wall
Photos
23 Hydronic floors are finished and some views of the water system.
Photos
22 Forms come off the Trombe wall! The hydronic floors start going
in.
Photos
21 Forms finshed and the Trombe wall is poured!
Photos
20 Forms on the Trombe wall and the cistern gets plumbed.
Photos
19 The water storage tank is in and the Trombe wall forms are up.
Photos
18 Trombe wall being formed up and utilities going in.
Photos
17 More work and Don gets to visit the site.
Photos
16 Courtyard fun and filling in the inside.
Special
The delivery of the timbers from Big Timberworks
Photos
15 Interior footings, sonotubes and backfilling being done.
Photos
14 Some more work, and bad weather delays.
Photos
13 Underfloor drains installed...
Photos
12 Special Request! Overview photos, fewer, but bigger.
Photos
11 Pouring stem walls, and starting to remove forms.
Photos
10 Still more stem walls.
Photos
9 More stem wall forms & wine time at Cathexes.
Photos
8 Stem walls forms being built.
Photos
7 Concrete pour #1
Photos
6 Almost all the steel is in!
Photos
5 More steel and Peter and Kim visit the site.
Photos
4 Digging the footings out, first steel in the ground.
Photos
3 Layout of the footing locations.
Photos
2 More of the digging.
Photos
1 First dirt moving.
Ground
Breaking... John and Mary's 1/19/2003


Digital photography, copyright 2001, 2002 and 2003 by John Sagebiel and Mary Cablk